recently completed sewer projects
A number of Capital Improvement Projects are completed each year. listed Below is a sampling of recently completed projects.
Project: N. Cananea and Vale Terrace at E. Vista Way Pipeline Upsize Project
Location:
N. Cananea and Vale Terrace at E. Vista Way (This was an upsize project, however, severe grease buildup was evident in many sections of the old pipeline.)
Before:

After:

Project:
2011 Emergency Lining Project - Buena Sanitation District
Location: Buena Outfall pipe going into Encina Wastewater Facility (25 year old severely corroded reinforced concrete pipeline. In this case, the pipe was repaired with a cured-in-place pipeliner.)
Before:

After:


Project:
2010 Emergency Replacement Project - Vista/Carlsbad
Location:
Vista/Carlsbad pipe going into Encina Wastewater Facility
(25 year old reinforced concrete pipeline that collapsed. Replaced with a concrete and fiberglass composite pipe (CCFRMP)
Before:

After: