Capital Improvement Project
The Engineering Department Capital Improvement Projects (CIP) Division is dedicated to improving the quality of life for Vista residents. Through a diligent prioritization process, the CIP Division is able to identify facilities or infrastructure most in need of repair, locate funding through the City’s General Fund or outside grants, select the appropriate contractor to complete the work, and finalize the project for public use.
Contact
Sudi Shoja, Assistant Director of Engineering, (760) 726-1340 x 1322, E: sshoja@cityofvista.com
Capital Improvement Projects
Media Releases
- Proposition 1B Funds Available to Fund Vista Transportation Projects - Feb. 10, 2008
- Proposition 1B Funds Available to Fund Vista Transportation Projects - Feb. 15, 2009
Information on Advertised Solicitations
- Listing of all Advertised Projects
- Listing of all Advertised Request for Proposals and Request for Quotes
- Listing of Bid Results
Completed Projects
Project: E. Vista Way Utility Undergrounding
Location: E. Vista Way between Arcadia Ave and Civic Center Dr
Before:

After:


Project: Buena Vista Creek Walk
Location: Buena Vista Creek between Brengle Terrace Park/Ponderosa Drive and Capri Drive cul-de-sac
Before:

After:


Project: Escondido Avenue Medians for Traffic Calming
Location: Civic Center Drive (formerly Escondido Avenue) between SR78 and Oceanview Terrace (Hazard Elimination Safety project)
Before:

After:


Project: Foothill Drive Street Improvements
Location: Foothill Drive between Beverly Drive and Vale Terrace
Before:

After:


Project: Grapevine School Sidewalks
Location: Grapevine Road between Olive Avenue and Date Street (Safe Routes to School project)
Before:

After:


Project: Hacienda Storm Drain Replacement
Location: Replacement of a 42-inch 40-yr old failed metal pipe with a new 42-inch reinforced concrete pipe
Before:

After:


Project: Olive Avenue Street Improvements
Location: Olive Avenue between Melrose Drive and Vista Village Drive (Pedestrian Safety Program project)
Before:

After:


Project: W. California Avenue Street improvements
Location: W. California Avenue betwen W. Los Angeles Drive to N. Santa Fe Avenue
Before:

After:


Project: Boys and Girls Club
Location: W. California Avenue and Calle Chapultepec
Before:

After:


Project: Vista Village Drive Bridge Repair
Location: Vista Village Drive and SR78 Off-Ramp