Capital Improvement Project

The Engineering Department Capital Improvement Projects (CIP) Division is dedicated to improving the quality of life for Vista residents. Through a diligent prioritization process, the CIP Division is able to identify facilities or infrastructure most in need of repair, locate funding through the City’s General Fund or outside grants, select the appropriate contractor to complete the work, and finalize the project for public use.

Contact

Sudi Shoja, Assistant Director of Engineering, (760) 726-1340 x 1322, E: sshoja@cityofvista.com

Capital Improvement Projects

Media Releases

Information on Advertised Solicitations

Completed Projects

Project: E. Vista Way Utility Undergrounding
Location: E. Vista Way between Arcadia Ave and Civic Center Dr

Before:
E. Vista Way Utility Undergrounding Project

After:
E Vista Way Utility Undergrounding Project after picE. Vista Way Utility Undergrounding project after pic

Project: Buena Vista Creek Walk
Location: Buena Vista Creek between Brengle Terrace Park/Ponderosa Drive and Capri Drive cul-de-sac

Before:
Buena Vista Creek Walk before pic

After:
Buena Vista Creek Walk after picBuena Vista Creek Walk after pic

Project: Escondido Avenue Medians for Traffic Calming
Location: Civic Center Drive (formerly Escondido Avenue) between SR78 and Oceanview Terrace (Hazard Elimination Safety project)

Before:
Escondido Ave Medians for traffic calming project before pic

After:
Escondido Avenue Medians for Traffic Calming Project after picEscondido Avenue Medians for Traffic Calming Project after pic

Project: Foothill Drive Street Improvements
Location: Foothill Drive between Beverly Drive and Vale Terrace

Before:
Foothill Drive Street Improvements Project before pic

After:
Foothill Drive Street Improvements Project after picFoothill Drive Street Improvements Project after pic

Project: Grapevine School Sidewalks
Location: Grapevine Road between Olive Avenue and Date Street (Safe Routes to School project)

Before:
Grapevine School Sidewalks Project before pic

After:
Grapevine School Sidewalks Project after picGrapevine School Sidewalks Project after pic

Project: Hacienda Storm Drain Replacement
Location: Replacement of a 42-inch 40-yr old failed metal pipe with a new 42-inch reinforced concrete pipe

Before:
Hacienda Storm Drain Replacement Project before pic

After:
Hacienda Storm Drain Replacement Project after picHacienda Storm Drain Replacement Project after pic

Project: Olive Avenue Street Improvements
Location: Olive Avenue between Melrose Drive and Vista Village Drive (Pedestrian Safety Program project)

Before:
Olive Avenue Street Improvements  before pic

After:
Olive Avenue Street Improvements after picOlive Avenue Street Improvements after pic

Project: W. California Avenue Street improvements
Location: W. California Avenue betwen W. Los Angeles Drive to N. Santa Fe Avenue

Before:
W. California Avenue Street improvements before pic

After:
W. California Avenue Street improvements after picW. California Avenue Street improvements after pic

Project: Boys and Girls Club
Location: W. California Avenue and Calle Chapultepec

Before:
Boys and Girls Club before pic

After:
Boys and Girls Club after picBoys and Girls Club after pic

Project: Vista Village Drive Bridge Repair
Location: Vista Village Drive and SR78 Off-Ramp

Before:
Vista Village Drive Bridge Repair before pic

After:
Vista Village Drive Bridge Repair after picVista Village Drive Bridge Repair after pic